KEDGEWICK

What will your project actually cost?

Real 2026 prices including VAT, from the jobs we finished last year. Use the estimator for a range, then book a visit for a fixed, written quote.

What are you planning?

24 m²

8 m²60 m²

Finish
Will it need planning permission?

Estimated price, including VAT

£57,000 – £69,000

Weeks on site
11 weeks
Before we start
Drawings and approvals: 4 to 6 weeks

Approvals you will need

  • Permitted development: a lawful development certificate is advised
  • Building regulations approval
  • Party wall notice if you build on or near the boundary
Request a site visit

A guide range from our 2026 prices, not a quote. The fixed written quote follows the free site visit.

Rates behind the estimator

Per square metre of new floor (per metre of span for an opening), plus fixed costs for things like stairs, drainage and steelwork.

Project StandardMidPremium Fixed costs
Single-storey extension £1,900 / m²£2,300 / m²£2,850 / m² £6,500
Double-storey extension £1,750 / m²£2,100 / m²£2,600 / m² £9,500
Loft conversion £1,500 / m²£1,850 / m²£2,300 / m² £7,500
Garage conversion £1,000 / m²£1,250 / m²£1,600 / m² £3,500
Structural opening £950 / m£1,150 / m£1,450 / m £2,800

Three routes to more room

Cost, time and paperwork for the three jobs most people are choosing between.

Rear extensionLoft conversionGarage conversion
Typical cost per m² £1,900 – £2,850£1,500 – £2,300£1,000 – £1,600
Typical all-in price £48,000 – £75,000£45,000 – £66,000£21,000 – £30,000
Weeks on site 9 – 147 – 104 – 6
Planning Often permitted developmentRear dormer usually permittedUsually permitted
Building regulations YesYes, plus fire escape routeYes
Garden lost Yes, the footprintNoneNone (you lose parking)
Best for A bigger kitchen-dinerA bedroom and shower roomA study, playroom or utility

You never pay ahead of the work

A 10% deposit books your start date. After that, each payment is due only when the work it covers is finished and, where it applies, signed off by building control.

Provisional sums (a drain in the wrong place, a soft spot in a trench) are named and priced in the quote and only charged if they happen. Changes you ask for are priced in writing before we do them.

  1. Booking the start date10%
  2. Foundations and drainage signed off20%
  3. Walls to plate, steels in25%
  4. Roof on and weathertight20%
  5. Plastered and first fix complete15%
  6. Handover and completion certificate10%

From first visit to handover

  1. Site visit

    Within 10 working days

    We walk the house with you, measure, check the drains and the loft, and tell you what needs approval. Free, about an hour.

  2. Drawings and approvals

    4 to 12 weeks

    Our designer draws it, the engineer sizes the steels, and we submit planning and building regulations for you.

  3. Fixed written quote

    5 working days after drawings

    Line by line, provisional sums named, a start date and a programme week by week. You sign when you are ready.

  4. The build

    As programmed

    One site manager, a weekly update every Friday, building control booked and met. The site is swept every evening.

  5. Handover

    Last week on site

    A snagging walk-round, the completion certificate, the guarantee in writing and a visit back at six months.

Turn the range into a fixed price

The site visit is free and takes about an hour. We are booking starts from March 2027. Site visits within 10 working days.